Capacities

Any tasks that are to be calculated, be they manual work or performed by machinery are defind as capacities.

Learn more »

The four available types are work step, outsourcing, assembly and quality control. When assigning a capacity to a calendar it is specified how long it can be used for per day. Time calculations can be made dependant on transition times and the number of identical capacities.

Show less «

Slide 1
Bild ist nicht verfügbar
Slide 2
Bild ist nicht verfügbar
Slide 3
Bild ist nicht verfügbar
Slide 3
Bild ist nicht verfügbar
previous arrow
next arrow

Features

  • up to 999 calendars
  • graphical utilization overview
  • previous data
  • post calculation

Reseller contact

Sack EDV- Systeme GmbH

Telefon: +49 791 9567730 0


Web: www.sackedv.de